What data is needed for utility connection requests?
Utility connection requests require you to tell us the power you need, the voltage (usually low tension 230 volts for homes) and a supply address.
In the event of requests relating to a plurality of connection points you will need to supply us with the residential building plan, the number of connection points, voltage and overall power needs.