What data is needed for the connection request?
At least the following data is required for the connection request: location of the gas redelivery point(s); end customer’s identification data (first and last name, tax code, etc.); expected total capacity of the appliances to be installed (this is important to choose the type of meter); gas use category; for redelivery points with annual withdrawals greater than 200,000 standard cubic metres, daily commitment expressed in standard cubic metres/day, and expected annual withdrawal.