What are the steps and costs involved in activating the supply?
Once it receives confirmation from the distributor that the meter has been installed, AGN ENERGIA will activate the supply.
- document verification cost: € 80 excluding VAT, depending on the system type;
- AGN ENERGIA administration costs of € 120 excluding VAT