Can the power be changed during the take-over?

When applying for take-over, it is possible to request the power variation by means of a special form to be attached to the take-over contract.

The following costs are incurred to reactivate the meter:

  • activation fee for the distributor: € 25.20 excluding VAT (tariff applied by e-distribuzione for the year 2021). For other distributors, the tariff may vary slightly;
  • AGN ENERGIA administrative costs of € 40 excluding VAT.